AI video production, storyboard to export

Turn ideas into finished videos with AI, fast

Plan scenes, generate clips, and export polished edits — all in one collaborative workspace.

Free forever: 1 project, the full browser timeline editor, watermarked 720p exports, and 100 bonus AI tokens. No card required.

The CineGen timeline editor with a media bin of generated scene stills, video preview player, inspector panel, and multi-track timeline

The CineGen timeline editor — one of the live production tools inside the app.

From concept to cut in minutes

Go from storyboard to rendered clips without tool-switching.

Consistent characters and style

Keep voices, looks, and tone aligned across scenes.

Designed for teams

Share, review, and approve work with zero friction.

Inside the app

A look at the live CineGen workspace — the same tools you get the moment you sign up.

AI Storyboarder

Prompt a story, get sequenced shots

Describe your story and get multi-scene sequences with shot types, descriptions, and dialogue — then drag them straight into your master storyboard.

The AI Storyboarder generating multi-scene sequences with shot types and dialogue
Character Creator

Define a character once, keep it everywhere

Set look, voice, and personality one time — CineGen keeps your characters consistent across every scene you generate, with one-click voiceovers.

The Character Creator with AI profile generation and a categorized character library
Timeline Editor

A real multi-track editor, not just a prompt box

Multi-track editing with a media bin, live preview, clip inspector, keyframes, transforms, and one-click export.

The CineGen timeline editor with media bin, preview player, and inspector
Project Dashboard

Every production in one place

All your projects with aspect ratio, resolution, and status at a glance — jump back into any production in one click.

The CineGen project dashboard with project thumbnails and statuses
3D Scene Creator

Block your shot in 3D, then let AI shoot it

Load gaussian-splat environments, drop in characters, and set camera keyframes — CineGen interpolates the move into a finished clip, with live cost estimates before you render. In beta now.

The CineGen 3D Scene Creator with a 2D and 3D layout toggle, storyboard scenes, and a shot setup inspector
Collaboration & Review

Share a link, gather feedback, approve

Send timeboxed review links that need no account, collect timestamped comments, manage per-project roles and pooled team seats, and auto-render on approval.

The CineGen Share and Review page with shareable review links and project access controls

How it works

01

Storyboard it

Prompt the AI Storyboarder and shape scenes, shots, and dialogue into a plan.

02

Generate scenes

Turn shots into video clips with consistent characters and voices, batched and auto-added to your media bin.

03

Cut and export

Polish everything on the multi-track timeline and export your finished edit.

Everything you need, end to end

CineGen combines character creation, scene blocking, AI video generation, timeline editing, audio-reactive effects, and collaborative review in one workspace. Tap a category for the full feature list.

Character Creator

  • Reusable character library with custom categories
  • AI-generated character portraits, profiles, and personality traits
  • Image analysis for physical descriptions and clothing details
  • ElevenLabs voice selection with integrated previews
  • Reusable wardrobe sheets with multiple outfits and a selectable default
  • Multi-view character and outfit references
  • AI-generated character billboard poses
  • Consistent character references shared across scenes and generations

Verified avatars & talking heads

  • Reusable avatar built from your own verified appearance
  • Phone-based QR verification with front, left, and right identity references
  • Liveness checks designed to prevent unauthorized likeness creation
  • Scripted talking-head generation with timed talking points
  • Reusable idle-animation segments between dialogue
  • ElevenLabs Voice Changer for talking-head characters
  • Automatic assembly into a finished portrait or landscape cut

Built for the next generation of storytellers

Solo Creators & Small Studios

Producing shorts, explainers, and promos without the overhead.

Marketing Teams

Iterating on social content at scale and launching campaigns faster.

Educators & Students

Turning scripts into compelling visual stories for the classroom.

Integrates with your workflow

Connect CineGen to your favorite tools.

ElevenLabsGoogle DriveDropboxSlackGoogleMicrosoft

A plan for one creator or the whole team

Team plans use seat-based billing and combine every seat's AI allowance into one shared token pool.

Editor+

$14.99/mo

Full editor with premium cloud processing.

AI tokens not included

Creator

$19/mo

For filmmakers shipping shorts.

1,000 tokens / month

Pro

$49/mo

For creators producing every week.

2,800 tokens / month

Studio

$99/mo

For demanding production workflows.

6,000 tokens / month

Our story and team

Our story

One production workspace, from first idea to final cut

CineGen began with a simple problem: creating an AI-assisted video meant moving between disconnected tools for storyboarding, character design, generation, editing, and review. We are building a browser-based production workspace that brings those steps together so creators and small teams can spend less time managing files and more time shaping the story. Operated by AIon X LLC, CineGen has a working product and a subscription-based business model designed for independent creators, studios, and marketing teams.

Portrait of Casey Shore, founder of CineGen

Casey Shore

Founder & Lead Engineer, AIon X LLC

CineGen is designed, built, and operated by Casey Shore, a full-stack software engineer based in California, United States. Casey works across the entire product — the React frontend, the Firebase and Google Cloud backend, and the AI video, voice, and storyboarding pipelines. CineGen is part of the AIon X product portfolio.

Frequently asked questions

Ready to generate your first scene?

Start creating in minutes. No credit card required.